
Table of Contents
- What is E-Z Pool Concentrated Pool Blend?
- How E-Z Pool Works: The Chlorine-Free Advantage
- Step-by-Step Guide to Using E-Z Pool
- Dosage Calculations and Pool Size Guide
- Proper Application Methods
- Water Testing and Maintenance Schedule
- Troubleshooting Common Issues
- Combining with Solar Pool Ionizers
- Frequently Asked Questions
What is E-Z Pool Concentrated Pool Blend?
E-Z Pool Concentrated Pool Blend is a revolutionary, chlorine-free pool maintenance system designed to simplify pool care while providing exceptional water quality. This innovative blend combines advanced enzymes, natural minerals, and specialized clarifiers to keep your pool clean, clear, and algae-free without the harsh chemicals, strong odors, or frequent testing associated with traditional chlorine-based systems.
Unlike conventional pool chemicals that require complex balancing and frequent adjustments, E-Z Pool offers a straightforward approach to pool maintenance that reduces chemical dependency and makes pool ownership more enjoyable. When integrated with modern pool cleaning routines and innovative technology like solar pool ionizers, E-Z Pool creates a comprehensive, low-chemical maintenance system that keeps your pool pristine with minimal effort.
How E-Z Pool Works: The Chlorine-Free Advantage
E-Z Pool utilizes a multi-action formula that addresses pool maintenance through four key mechanisms:
Key Benefits:
- Enzyme Technology: Breaks down organic contaminants like body oils, lotions, and other swimmer waste at the molecular level
- Natural Clarification: Aggregates microscopic particles for easy filtration without chemical coagulants
- Scale Prevention: Controls mineral buildup that causes cloudy water and surface scaling
- Algae Inhibition: Creates an environment where algae cannot thrive naturally
- Chlorine-Free Operation: Eliminates chlorine's harsh effects, odors, and frequent testing requirements
- pH Stability: Maintains balanced water chemistry without constant adjustments
- Compatibility: Works perfectly with solar pool ionizers and other alternative sanitization systems
For pool owners seeking to reduce chemical usage further, explore how solar ionizers keep pools clear without harsh chemicals.
Step-by-Step Guide to Using E-Z Pool
Step 1: Calculate Your Pool Volume
Accurate dosing begins with knowing your pool's water capacity. Use these standard calculations:
- Rectangular Pools: Length Ă Width Ă Average Depth Ă 7.5 = Total Gallons
- Round Pools: Diameter Ă Diameter Ă Average Depth Ă 5.9 = Total Gallons
- Oval Pools: Length Ă Width Ă Average Depth Ă 6.7 = Total Gallons
- Freeform Pools: Divide into geometric sections and sum the volumes
Understanding your pool's specifications is essential for all maintenance tasks. Learn more about your pool's filtration system to optimize treatment distribution.
Step 2: Determine Initial Dosage
For first-time E-Z Pool application or pools transitioning from chlorine systems:
- Standard Initial Dose: 1 lb per 5,000 gallons of pool water
- Heavily Used Pools: Increase to 1.5 lbs per 5,000 gallons
- Converting from Chlorine: Allow chlorine levels to drop below 1 ppm before starting E-Z Pool
- Seasonal Opening: Use initial dose when opening pool for the season
Example Calculations:
- 10,000-gallon pool: 2 lbs initial dose
- 15,000-gallon pool: 3 lbs initial dose
- 20,000-gallon pool: 4 lbs initial dose
Step 3: Apply E-Z Pool to Your Pool
Proper application ensures even distribution and maximum effectiveness:
Application Methods:
- Direct Skimmer Addition: Pour measured E-Z Pool directly into skimmer basket with pump running
- Perimeter Distribution: Broadcast product evenly around pool edge, walking the entire perimeter
- Pre-Dissolution (Optional): Dissolve in bucket of pool water before adding for faster distribution
Best Practices:
- Apply in evening for overnight effectiveness
- Ensure pump is running during and after application
- Avoid concentrated dumping in one area
- Brush pool surfaces after application to distribute product
- Use appropriate protective gear when handling
Avoid common pool maintenance mistakes that reduce treatment effectiveness.
Step 4: Circulate and Monitor
After application, proper circulation is crucial:
- Initial Circulation: Run pool pump continuously for 24-48 hours after first application
- Routine Circulation: Maintain normal filtration schedule (8-12 hours daily)
- Water Testing: Test water clarity and chemistry after 24-48 hours
- Visual Inspection: Check for improved clarity and reduced surface scum
Learn about how circulation supports proper maintenance.
Step 5: Establish Maintenance Dosage
After initial treatment, establish regular maintenance schedule:
- Weekly Maintenance: Add Œ lb per 5,000 gallons weekly
- Bi-Weekly Option: For lightly used pools, œ lb per 5,000 gallons every two weeks
- Heavy Use Periods: Increase to weekly full maintenance dose during peak swimming season
Dosage Calculations and Pool Size Guide
Standard Dosage Chart
Initial Treatment (First Application):
- 5,000 gallons or less: 1 lb
- 10,000 gallons: 2 lbs
- 15,000 gallons: 3 lbs
- 20,000 gallons: 4 lbs
- 25,000 gallons: 5 lbs
- 30,000 gallons: 6 lbs
Weekly Maintenance:
- 5,000 gallons or less: Œ lb
- 10,000 gallons: œ lb
- 15,000 gallons: Ÿ lb
- 20,000 gallons: 1 lb
- 25,000 gallons: 1Œ lbs
- 30,000 gallons: 1œ lbs
Seasonal Adjustments
- Summer (Peak Season): Maintain weekly dosing schedule consistently
- Spring Opening: Begin with initial dose, then transition to maintenance
- Fall Transition: Continue weekly dosing until pool closing
- Winter (If Open): Reduce to monthly maintenance in warmer climates
Special Circumstances
- After Heavy Use: Add extra maintenance dose following pool parties or events
- Following Rainstorms: Add maintenance dose after significant rainfall
- High Temperatures: Increase frequency during heat waves
- Visible Contamination: Return to initial dose if water quality deteriorates
Proper Application Methods
Skimmer Basket Application (Recommended)
Adding E-Z Pool directly to your skimmer basket provides gradual, controlled distribution:
- Ensure pump is running and skimmer basket is clean
- Measure correct dosage using provided scoop or scale
- Pour product directly into skimmer basket
- Allow system to circulate for several hours
- Clean skimmer basket after 24 hours to remove residue
Direct Pool Application
For pools without functional skimmers or when immediate distribution is needed:
- With pump running, walk around pool perimeter
- Broadcast product evenly across water surface
- Avoid concentrated areas near steps or corners
- Brush pool surfaces immediately after application
- Run pump continuously for 24 hours
Pre-Dissolution Method
For faster results or when dealing with water clarity issues:
- Fill 5-gallon bucket Ÿ full with pool water
- Add measured E-Z Pool while stirring continuously
- Stir until completely dissolved (2-3 minutes)
- Pour dissolved solution around pool perimeter
- Brush pool thoroughly after application
Water Testing and Maintenance Schedule
Weekly Maintenance Tasks
- Add E-Z Pool: Apply weekly maintenance dose per pool size
- Test Water Clarity: Visually inspect water for sparkle and transparency
- Check pH Levels: Test pH weekly (ideal range: 7.2-7.6)
- Brush Surfaces: Brush pool walls, floor, and steps thoroughly
- Skim Debris: Remove surface debris daily
- Clean Skimmer: Empty skimmer and pump baskets regularly
- Follow Routine: Maintain complete weekly cleaning routine
Monthly Maintenance Tasks
- Deep Filter Cleaning: Backwash sand filters or clean cartridge filters
- Tile Cleaning: Clean pool tiles to prevent buildup
- Equipment Inspection: Check pump, filter, and other equipment
- Waterline Cleaning: Remove scum line and surface oils
- Solar Ionizer Maintenance: If using, clean solar pool ionizer regularly
Seasonal Maintenance
- Spring Opening: Follow summer preparation guidelines
- Summer Peak: Increase maintenance frequency during heavy use
- Fall Closing: Prepare for winter with proper closing procedures
- Winter Maintenance: Follow winter maintenance tips if pool remains open
Troubleshooting Common Issues
Cloudy Water Persists
Possible Causes: Insufficient filtration, improper dosage, poor circulation, filter needs cleaning.
Solutions:
- Run pump continuously for 48 hours
- Clean or backwash filter thoroughly
- Add extra maintenance dose
- Check for proper circulation throughout pool
- Review how to handle cloudy water
Algae Appears
Possible Causes: Insufficient product, poor circulation, heavy contamination, high temperatures.
Solutions:
- Return to initial treatment dose
- Brush pool thoroughly before retreating
- Run filter continuously for 72 hours
- Consider combining with algaecide if severe
- Improve circulation in problem areas
Surface Scum or Oils
Possible Causes: Heavy bather load, insufficient enzyme action, poor skimming.
Solutions:
- Increase maintenance dose frequency
- Skim surface more frequently
- Use tennis ball in skimmer to absorb oils
- Brush waterline regularly
- Require showering before swimming
Product Doesn't Seem Effective
Possible Causes: Incorrect dosage, poor water balance, expired product, insufficient circulation.
Solutions:
- Verify pool volume calculations
- Test and adjust pH to 7.2-7.6
- Check product expiration date
- Ensure proper pump operation and run time
- Clean filter to improve efficiency
Combining with Solar Pool Ionizers
E-Z Pool works exceptionally well with solar pool ionizers for a comprehensive, low-chemical pool maintenance system.
Synergistic Benefits:
- Complete Water Treatment: E-Z Pool handles organic waste and clarification while ionizers provide continuous sanitization
- Dramatic Chemical Reduction: Combined system reduces chemical dependency by up to 90% compared to traditional chlorine
- Enhanced Algae Prevention: Dual-action approach prevents algae through both enzymatic action and copper ionization
- Superior Water Quality: Maintains crystal-clear, comfortable water without chlorine odor or irritation
- Cost Savings: Reduces ongoing chemical expenses and maintenance time
- Environmental Benefits: Minimal chemical runoff and reduced environmental impact
Integration Protocol:
- Install solar ionizer according to manufacturer instructions
- Begin E-Z Pool treatment with initial dose as outlined
- Establish weekly E-Z Pool maintenance schedule
- Monitor copper levels weekly (ideal: 0.2-0.4 ppm)
- Clean ionizer regularly for optimal performance
- Replace with quality replacement kits as needed
- Test water clarity and chemistry weekly
Learn more about what solar pool ionizers are and how to choose the right system.
Frequently Asked Questions
How quickly will I see results with E-Z Pool?
Most pools show noticeable improvement in water clarity within 24-48 hours of initial treatment. Full results typically develop over 1-2 weeks as the system establishes balance.
Can I use E-Z Pool with my existing chlorine system?
E-Z Pool is designed as a chlorine-free alternative. If transitioning from chlorine, allow chlorine levels to drop below 1 ppm before beginning E-Z Pool treatment.
Is E-Z Pool safe for all pool types?
Yes, E-Z Pool is safe for vinyl, fiberglass, concrete, and plaster pools. The chlorine-free formula is gentle on all pool surfaces and equipment.
How often should I test my water with E-Z Pool?
Test pH weekly and monitor water clarity visually. Unlike chlorine systems, E-Z Pool doesn't require daily chemical testing. Learn about regular pool testing importance.
Can I swim immediately after adding E-Z Pool?
Yes, E-Z Pool is safe for immediate swimming. However, for best distribution, wait 1-2 hours after application before swimming.
What if I have a saltwater pool?
E-Z Pool is compatible with saltwater systems. It can be used alongside salt chlorine generators or as part of a reduced-chlorine maintenance program. Also consider saltwater pool maintenance practices.
Do I need to shock my pool with E-Z Pool?
E-Z Pool eliminates the need for traditional shocking. For heavy contamination, use an increased initial dose rather than chlorine shock.
How do I store E-Z Pool?
Store in a cool, dry place away from moisture and direct sunlight. Keep container tightly sealed when not in use.
Can E-Z Pool be used with a solar pool ionizer?
Absolutely! E-Z Pool and solar pool ionizers work perfectly together for a comprehensive, low-chemical pool maintenance system.
Conclusion: Simplified, Chemical-Free Pool Maintenance
E-Z Pool Concentrated Pool Blend offers a revolutionary approach to pool maintenance that eliminates the complexity and harshness of traditional chlorine systems. By following this comprehensive guide, you can enjoy crystal-clear, comfortable pool water with minimal maintenance and maximum swimming enjoyment.
Key Takeaways:
- Calculate pool volume accurately for proper dosing (1 lb per 5,000 gallons initial, Œ lb weekly maintenance)
- Apply to skimmer basket or broadcast evenly around pool perimeter
- Run pump continuously for 24-48 hours after initial application
- Maintain weekly dosing schedule during swimming season
- Test pH weekly and monitor water clarity visually
- Combine with solar pool ionizers for ultimate low-chemical maintenance
- Address issues promptly with increased dosing or circulation improvements
For the most comprehensive, eco-friendly pool care system, consider pairing E-Z Pool with solar pool ionizers to create a maintenance routine that keeps your pool pristine while dramatically reducing chemical usage and environmental impact.
If you have any questions about E-Z Pool or other pool maintenance products, please don't hesitate to reach out we're here to help you achieve the perfect pool with minimal effort and maximum enjoyment!


1 comment
where do you pour in the easy pool ? Directly in the pool or the strainer basket ?